engineering course chaWithout ample venting, higher temperatures improve inside stress which can drive lubricant earlier seal lips or boost lip make contact with stress, accelerating seal put on and grooving on the seal journals.ins & precision roller chains. One strand chain, multi-strand chains, double pitch chains, corrosion resistant chains, self-lubricating chains, attachment chains, leaf chains, and specialty chains.focus in electricity transmission items Chain,pto shaft, agricultural gearboxes , CATV items, mechanical seal, hydraulic and Pheumatic, and marketing items.
Overview
Fast Particulars
- Following Warranty Provider:
-
Video complex support
Are you browsing for a PTO h2o pump or PTO- pushed generator? Hundreds of PTO parts from EPG imply you can locate PTO shaft components and add-ons for no matter what sort of equipment you are functioning with. From PTO drive shafts to protect parts, we have dozens of substitute PTO components. We stock Eurocardan areas as effectively as Neapco parts since people are names you can believe in. Regardless of whether you want flex couplers or PTO shaft assemblies, we can aid.
- Local Service Location:
-
Egypt
- Showroom Location:
-
Egypt
- Kind:
-
areas
- After-sales Service Supplied:
-
Movie specialized assistance
Supply Capacity
- Supply Capacity:
- 30000 Piece/Parts for each Thirty day period
Packaging & Delivery
- Packaging Particulars
- Carton or Plywood case or PALLET
- Port
- NINGBO / SHANGHAI CHINA
Online Customization
widely used energy steering unit , steering units
BHR1,BHR2,BHR3 Hydraulic steering models are similar with BZZ sequence, extensively utilized to minimal pace and heavy load automobiles,like construction equipment, folklift ,tractor, harvester and helm management and many others.
Type |
Displacement (ml/r) |
Rated Flow (l/min) |
Max input pressure (Mpa) |
Max cont back strain(Mpa) |
Normal Input Torque |
BHR1,2,3-eighty | 80 | 8 | 17.five | two.five | <2.5 |
BHR1,2,3-one hundred | one hundred | ten | 17.five | two.5 | <2.5 |
BHR1,2,3-125 | a hundred twenty five | thirteen | 17.five | two.five | <2.5 |
BHR1,2,3-one hundred sixty | a hundred and sixty | sixteen | seventeen.5 | two.5 | <2.5 |
BHR1,2,3-two hundred | two hundred | twenty | 17.five | two.5 | <3 |
BHR1,2,3-250 | 250 | 25 | seventeen.5 | 2.five | <3 |
BHR1,2,3-280 | 280 | 28 | 17.5 | two.five | <3 |
BHR1,2,3-315 | 315 | 32 | 17.5 | two.5 | <3 |
BHR1,2,3-four hundred | four hundred | 40 | seventeen.5 | 2.5 | <3 |
BHR1,2,3-500 | 500 | fifty | seventeen.5 | 2.5 | <3 |
BHR1,2,3-630 | 630 | 60 | 17.5 | two.5 | <3 |
BHR1,2,3-800 | 800 | seventy five | 17.five | 2.5 | <3 |
BHR1,2,3-one thousand | one thousand | seventy five | seventeen.5 | two.five | <3 |
More Products
Packaging & Transport
OEM | sure |
Lead Time | 5-20 working days for less than 1500pcs |
Payment | L/C,T/T |
thirty% advance payment,the balance paid before shipment | |
Packing | Motor each have their own carton,the outer packing is a five-layer plywood boxes |
Shipping | one)By air or sea or combined transportation |
2)Express:TNT,FEDEX,UPS,DHL |
Company Information
Our Services