SNOW PLOW Power UNIT

Basic Description
Consisting of a stress balanced gear pump, DC motor, multi-functional manifold, valves, tank, ect., this power unit is designed to operate materials dealing with equipment. The decreasing motion is achived through the solenoid valve with the decreasing velocity managed by an adjustable needle valve. The left and appropriate functions are equipped having a dual pilot operated examine valve and cross-over relief valves.
Remark: Please consult our revenue engineer for that distinct pump displacement, motor electrical power or tank capacity.
Exclusive Notes
one. This energy unit is of S3 duty cycle, i.e.,non-continuous operation,thirty seconds on and 270 seconds off.
two. Clean all of the hydraulic components concerned prior to installation of the power unit.
three. Viscosity of your hydraulic oil shoud be 15~46 cst, which should really also be clean and totally free of impurities.N46 hydraulic oil is suggested.
4. This electrical power unit must be mounted horizontal.
5. Check the oil level in the tank following the initial start out on the power unit.
6. Oil changing is required after the original a hundred operation hrs, afterwards when just about every 3000 hrs.

Postagens relacionadas

pt_BRPortuguese