Common Description
Outfitted together with the zero leak bidirectional checking sole-noid valves, this electrical power unit is designed for your operation of two independent circuits. Which are respectively for your most important and subordinate platforms of your double scissors lift. Two cut-off valves are utilised for decreasing the machine manually in case of power loss. If far more independent circuits are essential for the application please make contact with us for availability.
Remark: one. Please seek the advice of our revenue engineer to the distinctive pump displacement, motor energy or tank capacity.
two. CSA or UL licensed motors can be found upon request.
Distinctive Notes
1. The AC motor is of S3 duty cycle, which can only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean each of the hydraulic parts concerned ahead of installation of the electrical power unit.
three. Viscosity on the oil shoud be 15~46 cst,along with the oil must be clean and free of charge of impurities,N46 hydraulic oil is proposed.
4. The power unit should really be mounted vertically.
5. Check the oil degree within the tank soon after the original operating on the energy unit.
six. Oil shifting is required just after the initial 100 operation hours,afterwards as soon as every single 3000 hrs.